Kononova Polina Aleksandrovna
Employee
Articles -
9
,
Conference attendances -
3
1
|
Kulachenko I.
, Kononova P.
An adaptive large neighborhood search for the robust rig routing
Expert Systems with Applications. 2023.
V.231. P.120626. DOI: 10.1016/j.eswa.2023.120626
WOS
Scopus
РИНЦ
OpenAlex
|
2
|
Kulachenko I.N.
, Kononova P.A.
A Hybrid Algorithm for the Drilling Rig Routing Problem
Journal of Applied and Industrial Mathematics. 2021.
V.15. N2. P.261-276. DOI: 10.1134/s1990478921020071
Scopus
OpenAlex
|
3
|
Kononov A.
, Kononova P.
, Gordeev A.
Branch-and-bound approach for optima localization in scheduling multiprocessor jobs
International Transactions in Operational Research. 2020.
N27. P.381 - 393. DOI: 10.1111/itor.12503
WOS
Scopus
OpenAlex
|
4
|
Kononova P.A.
, Kochetov Y.A.
A local search algorithm for the single machine scheduling problem with setups and a storage
Дискретный анализ и исследование операций. 2019.
V.26. N2. P.60-78. DOI: 10.33048/daio.2019.26.634
OpenAlex
|
5
|
Kulachenko I.N.
, Kononova P.A.
, Kochetov Y.A.
, Kurochkin A.A.
The Variable Neighborhood Search for a Consistent Vehicle Routing Problem under the Shift Length Constraints
IFAC-PapersOnLine. 2019.
V.52. N13. P.2314-2319. DOI: 10.1016/j.ifacol.2019.11.551
Scopus
OpenAlex
|
6
|
Kononova P.A.
, Kochetov Y.A.
A Local Search Algorithm for the Single Machine Scheduling Problem with Setups and a Storage
Journal of Applied and Industrial Mathematics. 2019.
V.13. N2. P.239-249. DOI: 10.1134/s1990478919020054
Scopus
OpenAlex
|
7
|
Beresnev V.L.
, Davydov I.A.
, Kononova P.A.
, Melnikov A.A.
Bilevel “Defender–Attacker” Model with Multiple Attack Scenarios
Journal of Applied and Industrial Mathematics. 2018.
V.12. N3. P.417-425. DOI: 10.1134/s1990478918030031
Scopus
OpenAlex
|
8
|
Kononov A.V.
, Kononova P.A.
On minimizing dataset transfer time in an acyclic network with four servers
Journal of Applied and Industrial Mathematics. 2016.
V.10. N4. P.494-504. DOI: 10.1134/s1990478916040050
Scopus
OpenAlex
|
9
|
Kononov A.
, Hong J-S.
, Kononova P.
, Lin F-C.
Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applications
Journal of Scheduling. 2011.
V.15. N4. P.487-497. DOI: 10.1007/s10951-011-0235-z
WOS
Scopus
OpenAlex
|
Conference attendances (3)
More info